Kalkulora

Concrete calculator

Work out the volume of a slab, footing or round column in metric or imperial units, and how many bags of cement and how much sand and gravel a nominal mix needs.

How it is calculated

  1. Volume: width × length × depth for slabs; π × (diameter/2)² × height for round columns. Imperial inputs are converted to metric (1 ft = 0.3048 m, 1 in = 25.4 mm) and results are shown in both cubic yards and m³.
  2. Waste: the percentage you enter is added to the volume (5–10% is common on small jobs).
  3. Dry volume: wet volume × 1.54.
  4. Shares: the dry volume is split by the mix ratio. A 1 : 2 : 4 mix has 7 parts: cement 1/7, sand 2/7, gravel 4/7.
  5. Cement weight: cement volume × 1440 kg/m³, divided by the bag weight and rounded up.

Example: a 5 m × 4 m slab, 15 cm deep, is 3 m³ (3.92 yd³). With a 1 : 2 : 4 mix that needs 4.62 m³ of dry material, of which 0.66 m³ is cement: 950.4 kg, or 39 bags of 25 kg. Sand is 1.32 m³ and gravel 2.64 m³.

Materials for 1 m³ (no waste, 25 kg bags)

MixCementSandGravel
1 : 1.5 : 3 (approx. M20) 403.2 kg (17 bags) 0.42 m³ 0.84 m³
1 : 2 : 4 (approx. M15) 316.8 kg (13 bags) 0.44 m³ 0.88 m³
1 : 3 : 6 (lean concrete, M10) 221.8 kg (9 bags) 0.46 m³ 0.92 m³

Sand and gravel tonnage uses typical dry bulk densities of 1540 and 1500 kg/m³; moisture and grading change these. Water is not included: keep the water-cement ratio around 0.5 and adjust for workability.

Frequently asked questions

How much cement do I need for 1 m³ of concrete?

With a 1 : 2 : 4 nominal mix, about 316.8 kg of cement, which is 13 bags of 25 kg. A richer 1 : 1.5 : 3 mix needs about 403.2 kg.

Why multiply by 1.54?

Dry cement, sand and gravel contain air gaps. When water is added and the mix is compacted, the gaps close, so roughly 1.54 m³ of dry materials make 1 m³ of wet concrete.

Can I use this for structural concrete?

No. Structural elements need a specified concrete grade and usually ready-mixed concrete designed to the relevant standard. Use this calculator for estimating materials for small, non-structural jobs such as paths, pads and fence-post footings.

Sources

Last updated:

These are material estimates, not a structural design. Follow your engineer’s specification for structural work and confirm quantities with your supplier.