Bags of ready-mix plaster from the usage printed on the bag, or cement and sand for a cement-sand render, from the area and average thickness.

Plaster type

How it is calculated

Ready-mix: kg = area (m²) × thickness (mm) × usage (kg/m²/mm) × (1 + waste / 100), divided by the bag weight and rounded up. Cement-sand render: wet volume = area × thickness; dry volume = wet × 1.33; cement and sand are the dry volume split by the ratio, with cement converted at 1440 kg/m³. Example: 10 m² at 12 mm with a 1 : 4 mix needs 46 kg of cement and 0.128 m³ of sand. Imperial inputs (ft², inches, lb) are converted to metric first.

Frequently asked questions

How much plaster do I need per square metre?

Bagged plasters state their usage as kg per m² per mm of thickness. Multiply area × thickness (mm) × that figure. If the bag says 1 kg/m²/mm, 20 m² at 10 mm needs 200 kg, or 7 bags of 30 kg.

How do I calculate cement and sand for render?

Wet volume is area × thickness. Dry materials are about 1.33 times the wet volume, split by the mix ratio. In a 1 : 4 mix, one fifth is cement (1440 kg/m³) and four fifths sand.